List of operated/existing/abandoned hydropower sites.

S/N Hydropower site Size, kW S/N Hydropower site Size, kW S/N Hydropower site Size, kW
Source: Kassana et al. [15] 17 Sakare 6.3 32 Momba 10000
1 Bulongwa 180 18 Tosamaganga 1220 33 Nakatuta 10000
2 Ikonda 40 19 Uwemba 800 34 Ninga 4000
3 Isoko 15.5 Source: REA [16] Source: Kaunda et al. [14]; Klunne and Michael [17]
4 Isoko I 7.3 20 Isigula 407 35 Maguu 50
5 Kaengesa 44 21 Jangwani 200 36 Makumira 1
6 Kikuletwa 1160 22 Lupali 10000 37 Matembwe 150
7 Kitai 45 23 Mapembasi 10000 38 Mavanga 150
8 Mabarari 700 24 Mpando 300 39 Mawengi 150
9 Mbalizi 340 25 Mwenga 4000 40 Lugarawa 140
10 Ndanda 14.4 26 Nkole 2000 41 Kinko 10
11 Ndolage 55 27 Nyitule 300 42 Wino 80
12 Ngaresero 15 Source: REA [18] Source: Site visit
13 Nyagao 15.8 28 Ibaga 1000 43 Zigi 20
14 Nyangao 38.8 29 Kitewaka 2000 44 Ngaresero hotel 3
15 Peramiho 34.6 30 Ludende 500
16 Rungwe 21.2 31 Mafigiro 3000 Total (MW) 63.21

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.