Fig. 6

Download original image
The actual layout of the PV panels of the first 7.8 kW − PV domestic building (House #4) in Bahrain. Top of PV panels (top right), below the PV panels (top left), during the official inauguration of the project (bottom right) of the house and view of the installed of the roof PV from ground and from neighborhood (bottom left).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.