Open Access
Table 1
Cable joint failure modes, contributing factors and solutions outline.
Failure mode | Contributing factor(s) | Solution(s) |
---|---|---|
Application of mechanical forces | Contraction and expansion of metallic materials | Trifurcation of cable |
Excess cable for conductor expansion and contraction | ||
Installation of steel frames for mechanical strength | ||
Insufficient thermal dissipation | Incorrect thermal resistivity of materials | Utilisation of location based thermal resistivity data |
Overloaded circuits | Circuits operating close to or over the design ratings | Understanding of wind farm design principles |
Correct application of cable optimisation techniques | ||
Installation and workmanship quality | Poor workmanship due to inadequate training and workplace skills | Adequate and tailored training and education pathways for wind farm cable jointers |
Incorrect technology application | Incorrect application of componentry and technology | Ensure technology and componentry has been designed, tested and manufactured specifically for wind farm applications |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.