Open Access
Review

Table 2

Prioritized hydropower sites by network.

Network Project site River/Basin Head (m) Planned Installed capacity (MW) Investment costs (Md Fcfa)
SIN Mekin Dja et Lobo   15 20.44
Memve'ele Ntem   211 353.98
Menchum Catsina   84 145
Upstream Nachtigal Sanaga 40 392  
Njock phase I Nyong   156 169
Kep Catsina   555.6 729
Rta grand ngodi Sanaga 45 102  
Song dong Sanaga 24 260 515
Njock phase II Nyong   117 169
Upstream Kikot Sanaga 25 662 1,297
Bayomen Mbam   470 925
Downstream Nachtigal Sanaga 30 420 461
Mouila mogue Nyong   498 980
Rta (3rd site) Sanaga   90  
Upstream Edea Sanaga 40 474 622
NIN Bini a warak Vina nord 223 61.5 70
Mbinjal Faro 89 83 176
Mandourou Faro 115 70 131
Upstream Mbam phase I Mbam 165 74 146.5
Upstream Mbam phase II Mbam 165 75 146.5
Fo Faro 90 84 249
Mayo Darle Mbam 100 16 31
Mayo taram Mbam 175 29 57
EN Lom pangar phase I Sanaga 31 15 59
Lom pangar phase II Sanaga 31 15
Colomines Kadey 42 18 35
Ngoila Dja 50 124 329
Yenga Boumba 60 108.5 222
Nki falls Dja 108 297 793
Zoukomanbale Kadey 35 29 55

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.