Open Access
Review

Table 1

Number of hydropower sites and capability per river/basin.

Basin Number of sites Gross theoretical capability (TWh/yr) Technically exploitable capability (TWh/yr)
Nord 13 25 4.1
Sanaga 34 162 68
West 25 35 11.4
Nyong and Ntem 13 47 15
East 15 28 6.3

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.